Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Help  Obi Rope Lenght Problem
#7
(15-04-2020, 01:00 PM)josemendez Wrote: Handles were replaced by Attachments in 5.0. I you mean if Attachments are the same as pin constraints, not exactly.

Attachments can be static or dynamic. Static attachments are implemented using fixed particles (particles with their inverseMass set to 0). Dynamic attachments are implemented using pin constraints.

From the pin constraints manual page:
http://obi.virtualmethodstudio.com/tutor...aints.html


And from the attachments page:
http://obi.virtualmethodstudio.com/tutor...ments.html



Yes, that's the whole point of blueprints.  When you instantiate a blueprint, the runtime particle properties are copied from the blueprint values.

I'm using Obi Rope 4.1 btw. I should've inform you in first place. Sorry for that :/
Reply


Messages In This Thread
Obi Rope Lenght Problem - by relevantname - 15-04-2020, 11:57 AM
RE: Obi Rope Lenght Problem - by josemendez - 15-04-2020, 12:00 PM
RE: Obi Rope Lenght Problem - by relevantname - 15-04-2020, 12:31 PM
RE: Obi Rope Lenght Problem - by josemendez - 15-04-2020, 12:39 PM
RE: Obi Rope Lenght Problem - by relevantname - 15-04-2020, 12:46 PM
RE: Obi Rope Lenght Problem - by josemendez - 15-04-2020, 01:00 PM
RE: Obi Rope Lenght Problem - by relevantname - 15-04-2020, 01:13 PM
RE: Obi Rope Lenght Problem - by josemendez - 15-04-2020, 01:16 PM
RE: Obi Rope Lenght Problem - by relevantname - 15-04-2020, 02:08 PM