Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
scripting ropes with pin constraints & tethers
#5
Thanks Jose – that gets me much, much closer.

But it leaves two remaining questions unanswered:

1. The scripted rope still jumps around much more at initialization. Any way to fix that?

2. Assigning both ropes to the same solver (both with SolverA entered in the ObiRopeScriptTest inspector) causes the scripted rope to fail. Multiple "normal" ropes can be assigned to the same solver, but each scripted rope fails if it doesn't have its own dedicated solver.

Thanks once more!

- pH
Reply


Messages In This Thread
RE: scripting ropes with pin constraints & tethers - by phoberman - 30-12-2017, 07:25 PM