Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Help  Delay in Rope Pulling
#1
We have a classic crane setup where rope one end is attached (static) with pully at top and the other end is attached with load (dynamic with obi rigidbody and collider). Load is lifted by increasing and decreasing the rope length using the cursor.

We are facing a problem when load and rope are stable and at rest, there is a small delay in pulling up the load (specially when its grounded). It starts pulling the rope after noticeable delay sometimes more than 1-2 seconds.

Is it possible the length of rope is quite large and its taking sometime? how we can improve this?
Reply


Messages In This Thread
Delay in Rope Pulling - by vrtraining - 25-04-2023, 08:28 AM
RE: Delay in Rope Pulling - by josemendez - 25-04-2023, 08:56 AM
RE: Delay in Rope Pulling - by vrtraining - 25-04-2023, 09:04 AM
RE: Delay in Rope Pulling - by josemendez - 25-04-2023, 09:09 AM
RE: Delay in Rope Pulling - by vrtraining - 25-04-2023, 09:11 AM